Draw the roof once. Get the layout, the board list, the shop drawing and the quote from the same design. Nothing to copy, nothing to copy wrong.

It is never the roof. It is the paperwork.
The plans go to the manufacturer and you wait a week for a layout. The architect moves a drain, and you send it back and wait again. Every change is another round trip on someone else's schedule.
Or someone draws it by hand: courses sketched on the plan, letters written beside them, boards counted on a legal pad, numbers typed into the quote.
Then the errors start.
None of it shows up until the truck is short, the fabricator calls, or the margin is gone at close-out. Every one of those is a person moving a number from one sheet to another.
Draw the roof on the plan. Point each sloped area at its drain. Hit Compute.
The layout, the board list, the shop drawing, the budget and the proposal all read the same design. Change the roof and all of them change with it. There is no re-counting and no re-typing, so there is nothing to get wrong between the drawing and the price.
You are in control. You do not wait for the manufacturer to design your roof. When the plans change, you move a line and recompute. Minutes, not another week and another round trip.


A lettered plan the crew can carry onto the roof. Cut-through section through the run. Board designations for the manufacturer's own ladder. Isometric of the run with every filler board drawn. Panel schedule. PDF for the office, DXF for the fabricator.

Every board count lands on its own cost item in the budget: tapered boards, cricket boards, filler boards per thickness, base layer, cover board, sumps, fasteners, plates. Change the roof and the price follows.

One click puts the design into the proposal with the board list, the products table and the shop drawing attached.

Drawn on the plan like everything else. Diamond and half-diamond crickets, sized to the maker's rule or to your own. Sumps matched to a prefab part or cut in the field. Curbs and objects with their own wall thickness. Parapet nailer heights that show up on the section.

Letters and packaging straight from each maker's published tables. Pick the manufacturer and the system, and the design letters every course the way their layout department would. Carlisle · Hunter · Johns Manville · GAF · Atlas · Rmax · Siplast · Duro-Last · Holcim Elevate (Firestone) · IKO · Mule-Hide · Versico. Slopes from 1/16" to 1/2" per foot. Whole and half systems. Standard or extended board sets.
Boards per letter. Filler boards per thickness, so a 2" and a 4" filler are two lines, not one number. Crickets and sumps on their own lines. Waste already in. Cut pieces are nested on stock boards, so the count is what comes off the truck, not a square-foot guess.
Average R-value of the finished roof checked against IECC 2018, 2021 or 2024 for the job's county. You know it passes before the number goes out.
The Blocks runs in the browser on your phone and tablet. Draw the roof on the tablet while you are still on the site. Pull up the board list on your phone at the supplier's counter. Send the proposal from the truck and get the signature back before you are at the office. Nothing to install, nothing to sync.
Filler board 1 and filler board 2. Base layer with its ply count. Cover board. The design picks one 4" board over two 2" when that is the cheaper stack, and counts it that way.
Lengths sized to the build-up at every course. Pieces and cartons for the order. Adhesive units for adhered systems.
No silent defaults. If a sloped area has no drain direction, if the page is not calibrated, if a cricket cannot be built from the stock you chose, the design says so and stops. An honest "not yet" beats a number you cannot trust.
| Before | With The Blocks |
|---|---|
| A week waiting on the manufacturer's layout | Drawn and priced in an afternoon, by you |
| Every change goes back to the manufacturer | Move a line, recompute, done |
| Boards counted by hand, typed into the quote | Board list and quote come from one design |
| Fill and crickets remembered, sometimes | Fill, crickets and sumps on the list every time |
| Drawing updated, quote forgotten | Change the roof, everything follows |
| Short truck found out on the job | Found out never |
| Back to the office to check a number | Board list and proposal on your phone |
Save days on every tapered job. Bid more of them.
Any PDF. Calibrate the scale once.
Outline, drains, sloped areas, crickets, curbs. Snap to the plan's own lines.
One arrow from high to low per sloped area. That is the whole design input.
Layout, board list, shop drawing, products table, fastener order.
Counts flow into the budget. The proposal picks up the design with the drawing attached.
Tapered insulation is one module of The Blocks. The same job holds the takeoff, the budget, the proposal and the customer's signature. Nothing is exported to a spreadsheet and re-imported.
One plan. Everything included. Pay per seat.
$1,428/yr per seat
Draw the roof once. Get the layout, the board list, the shop drawing and the quote from the same design.