Skip to main content
The Blocks
PricingFree Apps & ToolsBlogAbout us
+1 347-962-1064Login

Features

  • AI Estimates
  • Takeoffs
  • Budgets
  • Bids & Proposals
  • Cost Catalog
  • CRM & Contacts
  • Tapered Insulation

Who We Serve

  • For Estimators
  • For General Contractors
  • For Subcontractors

By Trade

  • All trades
  • For Roofers
  • For Electricians
  • For Plumbers
  • For HVAC Contractors
  • For Concrete Contractors
  • For Drywall Contractors

Resources

  • Free Construction Apps & Online Tools
  • Construction Calculators
  • Field Tools
  • Blog

Company

  • About us
  • LinkedIn
  • +1 347-962-1064
  • Privacy Policy
  • Terms of Use

© 2026 The Blocks. All rights reserved.

  1. Home
  2. Features
  3. Tapered Insulation

Tapered insulation takeoffs in an afternoon, not a week

Draw the roof once. Get the layout, the board list, the shop drawing and the quote from the same design. Nothing to copy, nothing to copy wrong.

Try Free
The tapered insulation designer with a finished roof: lettered courses, drains, a cricket and the board list panel beside it

The way tapered jobs go wrong

It is never the roof. It is the paperwork.

The plans go to the manufacturer and you wait a week for a layout. The architect moves a drain, and you send it back and wait again. Every change is another round trip on someone else's schedule.

Or someone draws it by hand: courses sketched on the plan, letters written beside them, boards counted on a legal pad, numbers typed into the quote.

Then the errors start.

  • A course is skipped on the long run and every letter after it is wrong.
  • The cricket is counted as field board because it was easier.
  • Two 2" fillers go on the order where one 4" was stocked. Or the filler under the second repeat is forgotten.
  • A board count is typed into the quote from the drawing and one number is off by a zero.
  • The roof changes after the bid. The drawing is updated. The quote is not.

None of it shows up until the truck is short, the fabricator calls, or the margin is gone at close-out. Every one of those is a person moving a number from one sheet to another.

Take the design back in-house

Draw the roof on the plan. Point each sloped area at its drain. Hit Compute.

The layout, the board list, the shop drawing, the budget and the proposal all read the same design. Change the roof and all of them change with it. There is no re-counting and no re-typing, so there is nothing to get wrong between the drawing and the price.

You are in control. You do not wait for the manufacturer to design your roof. When the plans change, you move a line and recompute. Minutes, not another week and another round trip.

The plan with a sloped area selected and its Hi-Lo arrow pointing at the drain

What you get on every roof

A real shop drawing

A real shop drawing

A lettered plan the crew can carry onto the roof. Cut-through section through the run. Board designations for the manufacturer's own ladder. Isometric of the run with every filler board drawn. Panel schedule. PDF for the office, DXF for the fabricator.

A quote that updates itself

A quote that updates itself

Every board count lands on its own cost item in the budget: tapered boards, cricket boards, filler boards per thickness, base layer, cover board, sumps, fasteners, plates. Change the roof and the price follows.

One click into the proposal

One click into the proposal

One click puts the design into the proposal with the board list, the products table and the shop drawing attached.

Crickets, sumps, curbs and parapets

Crickets, sumps, curbs and parapets

Drawn on the plan like everything else. Diamond and half-diamond crickets, sized to the maker's rule or to your own. Sumps matched to a prefab part or cut in the field. Curbs and objects with their own wall thickness. Parapet nailer heights that show up on the section.

The boards you already buy

The boards you already buy

Letters and packaging straight from each maker's published tables. Pick the manufacturer and the system, and the design letters every course the way their layout department would. Carlisle · Hunter · Johns Manville · GAF · Atlas · Rmax · Siplast · Duro-Last · Holcim Elevate (Firestone) · IKO · Mule-Hide · Versico. Slopes from 1/16" to 1/2" per foot. Whole and half systems. Standard or extended board sets.

A board list you can send to a supplier

Boards per letter. Filler boards per thickness, so a 2" and a 4" filler are two lines, not one number. Crickets and sumps on their own lines. Waste already in. Cut pieces are nested on stock boards, so the count is what comes off the truck, not a square-foot guess.

Energy-code check before you bid

Average R-value of the finished roof checked against IECC 2018, 2021 or 2024 for the job's county. You know it passes before the number goes out.

Estimates in your pocket

The Blocks runs in the browser on your phone and tablet. Draw the roof on the tablet while you are still on the site. Pull up the board list on your phone at the supplier's counter. Send the proposal from the truck and get the signature back before you are at the office. Nothing to install, nothing to sync.

Two-layer and base-board builds

Filler board 1 and filler board 2. Base layer with its ply count. Cover board. The design picks one 4" board over two 2" when that is the cheaper stack, and counts it that way.

Fasteners and plates

Lengths sized to the build-up at every course. Pieces and cartons for the order. Adhesive units for adhered systems.

It tells you when something is missing

No silent defaults. If a sloped area has no drain direction, if the page is not calibrated, if a cricket cannot be built from the stock you chose, the design says so and stops. An honest "not yet" beats a number you cannot trust.

What changes for you

BeforeWith The Blocks
A week waiting on the manufacturer's layoutDrawn and priced in an afternoon, by you
Every change goes back to the manufacturerMove a line, recompute, done
Boards counted by hand, typed into the quoteBoard list and quote come from one design
Fill and crickets remembered, sometimesFill, crickets and sumps on the list every time
Drawing updated, quote forgottenChange the roof, everything follows
Short truck found out on the jobFound out never
Back to the office to check a numberBoard list and proposal on your phone

Save days on every tapered job. Bid more of them.

How it works

  1. 1

    Upload the plan.

    Any PDF. Calibrate the scale once.

  2. 2

    Draw the roof.

    Outline, drains, sloped areas, crickets, curbs. Snap to the plan's own lines.

  3. 3

    Aim each slope.

    One arrow from high to low per sloped area. That is the whole design input.

  4. 4

    Compute.

    Layout, board list, shop drawing, products table, fastener order.

  5. 5

    Price and send.

    Counts flow into the budget. The proposal picks up the design with the drawing attached.

Part of a full estimating platform

Tapered insulation is one module of The Blocks. The same job holds the takeoff, the budget, the proposal and the customer's signature. Nothing is exported to a spreadsheet and re-imported.

TakeoffsBudgetsBids & Proposals

Frequently Asked Questions

Simple, Transparent Pricing

One plan. Everything included. Pay per seat.

One plan. Everything included. Pay per seat.

  • Web access — desktop, tablet & mobile
  • AI-powered plan takeoffs
  • Manual markup tools
  • Cost estimating & budgets
  • Bid management & proposals
  • CRM & contact management
  • Document management
  • Version control
  • Cost catalog
  • Custom cost codes & assemblies
  • Multi-organization support
  • Role-based team access
  • Unlimited jobs, files, documents, bids, takeoffs, budgets, estimates
MonthlyAnnualSave 20%
$119per seat/mo

$1,428/yr per seat

See it on your own roof

Draw the roof once. Get the layout, the board list, the shop drawing and the quote from the same design.

Get Started